Workmen preparing footings for expansion at E.Z. Co. Zinc Works at Risdon
- AU TAS UTAS ITCCD 2018/6-23
- Item
- 1929-1930
Black-and-white photograph depicts workmen preparing footings for expansion of power house at E.Z. Co. Zinc Works at Risdon
55 results with digital objects Show results with digital objects
Workmen preparing footings for expansion at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph depicts workmen preparing footings for expansion of power house at E.Z. Co. Zinc Works at Risdon
Workers pause for photo inside new building at E.Z. Co Zinc Works 1924
Black-and-white photograph shows construction workers pausing for a photograph inside a new building at E.Z. Co. Zinc Works at Risdon 1924
Workers building framework of new building at E.Z. Co Zinc Works 1924
Black-and-white photograph shows piles of sawn timber, scaffolding and workers constructing the framework of a new building on an elevated site at the E.Z. Co. Zinc Works 1924
Workers assembling jacket of Derwent Prime furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows men assembling sides and ends of jacket of Derwent Prime furnace at E.Z. Co. Zinc Works at Risdon
Workers assembling base of furnace jacket at E.Z. Co. Zinc Works
Black-and-white photograph shows men assembling bottom jacket of Derwent Prime furnace at E.Z. Co. Zinc Works at Risdon
View of construction site uphill at E.Z. Co. Zinc Works at Risdon 1924
Black-and-white photograph shows view of new building on site, looking uphill, at E.Z. Co. Zinc Works at Risdon 1924
View downhill to River Derwent from E.Z. Co. Zinc Works 100-Ton Plant construction site
Black-and-white photograph shows view dowhill to River Derwent looking across construction site of E.Z. Co. Zinc Works construction site of 100-Ton Plant
Timber trusses, bricks and framework of new building under construction at E.Z. Co. Zinc Works 1924
Black-and-white photograph shows piles of bricks, timber trusses and timber framework of new building under construction at E.Z. Co. Zinc Works at Risdon 1924
Structure of power house takes shape at E.Z. Co. Zinc Works at Risdon 1921
Black-and-white photograph shows scaffolding and framework of concrete building to house power station at E.Z. Co. Zinc Works at Risdon
Stone masons and bricklayers at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows workers building stone foundations and laying bricks for another structure at E.Z. Co. Zinc Works at Risdon
Stone and timber foundations at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph depicts stone foundations and timber bearers inside a pit excavated into a hillside at E.Z. Co. Zinc Works in front of substantial corrugated iron-clad sheds also under construction
Stockpiles of rock and framework of new building
Black-and-white photograph shows framework and construction of building at E.Z. Co. Zinc Works at Risdon
Staging for Derwent Prime furnace jacket at E.Z. Co. Zinc Works
Black-and-white photograph shows men building staging for Derwent Prime furnace at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows sawmill, timber and unsawn logs being used for construction of new plant at E.Z. Co. Zinc Works at Risdon
Power house foundation work at E.Z. Co. Zinc Works
Black-and-white photograph shows foundation of power house 4th unit being built at E.Z. Co. Zinc Works at Risdon
Photographs of E.Z. Co. Zinc Works at Risdon
The collection features photographs taken by Hobart photographic studio Beattie’s Studio, also known as J.W. Beattie, for the Electrolytic Zinc Co. at the company’s Risdon smelter between 1920 and 1940. The collection depicts construction of new facilities at the factory complex. The first sod was turned on the zinc smeltering plant at Risdon on the western shore of the Derwent River on 16 November 1916, and a test smelter called the 250 lb plant was opened in 1917 to produce 250 lb of zinc a day using the recently developed Roast-Leach-Electrowin (RLE) process of extracting zinc through electrolysis. Electrolytic Zinc’s office occupied the former Derwent Inn. The larger 10-ton plant opened in January 1918 and the 100-ton plant opened in November, 1921. This collection of photographs depicts the phases of construction of the 100-Ton Plant, further expansion of the smelter and decomissioning of some of the older equipment at the zinc works. Beattie’s Studio was a photographic studio founded by Scotsman John Watt Beattie (1859-1930), who began exhibiting photographs soon after his arrival in Tasmania in 1878.
Beattie's Studios
Part of George Musgrave Parker: Correspondence and research records
George Musgrave Parker
Part of George Musgrave Parker: Correspondence and research records
Photograph taken by E.H. D'Emden
George Musgrave Parker
Part of George Musgrave Parker: Correspondence and research records
Photograph taken by E.H. D'Emden.
George Musgrave Parker
New weatherboard building at E.Z. Co. Zinc Works
Black-and-white photograph shows weatherboards fitted to new building at E.Z. Co. Zinc Works at Risdon
New buildings under construction above railway cutting at E.Z. Co. Zinc Works 1924
Black-and-white photograph shows construction of new buildings above a railway line cutting, looking west, at E.Z. Co. Zinc Works at Risdon 1924
Looking north to cell room extension at E.Z. Co. Zinc Works
Black-and-white photograph of construction of cell room extension at E.Z. Co. Zinc Works at Risdon. Large sign reading “SAFETY” is mounted at ground level.
Loading bay at E.Z. Co. Zinc Works
Black-and-white photograph depicts man standing in the shelter of a loading bay beside trolleys on tracks at E.Z. Co. Zinc Works at Risdon
Part of George Musgrave Parker: Correspondence and research records
Photograph taken by George Musgrave Parker
George Musgrave Parker
Interior tanks being fitted out in partially constructed building at E.Z. Co. Zinc Works
Black-and-white photograph shows partially completed tanks atop heavy concrete foundations in a building under construction, at E.Z. Co. Zinc Works at Risdon 1924
Interior of cell room at E.Z. Co. Zinc Works
Black-and-white photograph shows interior of cell room at E.Z. Co. Zinc Works at Risdon
Horse carts and timber at E.Z. Co. Zinc Works
Black-and-white photograph shows stacks of sawn timber and workmen with horses and carts removing earth at an excavation on site E.Z. Co. Zinc Works at Risdon
Horse and cart used in excavation of Derwent Prime furnace site at E.Z. Co. Zinc Works
Black-and-white photograph shows horse and cart positioned in pit while men excavate the site of the Derwent Prime furnace by hand at the E.Z. Co Zinc Works 1930
Part of George Musgrave Parker: Correspondence and research records
George Musgrave Parker
Framework of roasting division building at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows framework and construction of roasting division building at E.Z. Co. Zinc Works at Risdon, above railway line, with stockpile of logs and timber above railway cutting; Mount Faulkner in background
Framework for pouring concrete in the power station building at E.Z. Co. Zinc Works
Black-and-white photograph shows workmen sitting down and horse eating from nosebag in front of timber framework for concrete pour for construction of power station building at E.Z. Co. Zinc Works at Risdon 1921
Exterior view of cell room at E.Z. Co. Zinc Works 100-ton plant
Black-and-white photograph shows exterior of newly constructed cell room at E.Z. Co. Zinc Works at Risdon viewed from the south, looking downhill to the Derwent River.
Expansion of E.Z. Co. Zinc Works cell room 1930
Black-and-white photograph of construction of cell room extension at E.Z. Co. Zinc Works at Risdon. Men climbing on beams of roof, a large sign reading “SAFETY” is mounted at ground level.
Excavation work for construction of furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows workmen beginning excavation of site for new Derwent Prime furnace
Excavation for Derwent Prime furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows workmen digging earth and rubble to be loaded into a horse-drawn cart at excavation site for new Derwent Prime furnace being built at E.Z Co. Zinc Works 1930
Excavation and construction below railway line at Risdon
Black-and-white photograph shows excavation and construction of retaining walls at E.Z. Co. Zinc Works at Risdon below the level of the railway line
Black-and-white photograph shows an elevated view of the cell room building, the roasting division and other buildings under construction, looking west, with Mount Faulkner in the background 1921
Derwent Prime furnace jacket assembled at E.Z. Co. Zinc Works
Black-and-white photograph shows men assembling Derwent Prime furnace at E.Z. Co. Zinc Works at Risdon
Derwent Inn public house at Risdon Ferry
Part of George Musgrave Parker: Correspondence and research records
Haldane Cotsworth photograph - Carts and people in front. Endorsed: "among papers from Clebumes 1928"
George Musgrave Parker
Corrugated iron shed dwarfed by larger building under construction at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows small corrugated iron cottage or shed on a hillside below larger, open-fronted building under construction at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows elevated view of the construction of the roasting and leaching divisions of the 100-Ton Plant, below the cell room, at E.Z. Co. Zinc Works, looking west towards Mount Faulkner
Construction of retaining wall below train line at E.Z. Co Zinc Works
Black-and-white photograph shows construction of a retaining wall below the level of the train line for a new building as part of the roasting and leaching divisions of the 100-Ton Plant, at E.Z. Co. Zinc Works
Construction of retaining wall at E.Z. Co Zinc Works
Black-and-white photograph depicts workers building a retaining wall at E.Z. Co. Zinc Works at Risdon
Construction of pure solution tank at E.Z. Co. Zinc Works
Black-and-white photograph shows construction of No. 6 pure solution tank in the cell division at E.Z. Co. Zinc Works at Risdon, January 1930
Construction of new wharf at E.Z. Co. Zinc Works
Black-and-white photograph shows construction of new wharf at E.Z. Co. Zinc Works at Risdon
Construction of new Risdon wharf
Black-and-white photograph shows construction of wharf at E.Z. Co. Zinc Works at Risdon
Construction of leaching division below train line at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows view looking east of the framework of the newly constructed leaching division buildings below the level of the train line at E.Z. Co. Zinc Works 1921
Construction of furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows workmen building the Derwent Prime furnace at E.Z. Co. Zinc Works at Risdon
Concrete pouring tower hoisted at E.Z. Co. Zinc Works
Black-and-white photograph shows concrete pouring tower, held in position with stays during expansion of power house at E.Z. Co. Zinc Works at Risdon
Concrete framework of new building at E.Z. Co. Zinc Works
Black-and-white photograph depicts workman kneeling at base of partially constructed concrete-framed building and man straddling the roof beams on site of E.Z. Co. Zinc Works at Risdon
Concrete formwork for power house at E.Z. Co Zinc Works
Black-and-white photograph depicts man working on the concrete pouring tower for construction of the power house 4th unit at E.Z. Co. Zinc Works at Risdon
Part of Hal Wyatt Collection
Colour photograph of Cleburne Homestead, also known as the Mount Direction Homestead, a dwelling built in the 1830s at Risdon and threatened with demolition during the construction of the nearby Bowen Bridge.
Hal Wyatt
Cladding a building at E.Z. zinc works
Black-and-white photograph depicts workers fixing corrugated iron sheets to exterior wall of a new building at E.Z. Co. Zinc Works at Risdon
Cell room in the 100-ton plant
Black-and-white photograph shows the newly constructed cell room inside the 100-Ton plant at E.Z. Co. Zinc Works at Risdon, with Johns and Waygood stencilled on the overhead gantry
Carpenter in workshop at E.Z. Co. Zinc Works
Black-and-white photograph depicts carpenter working with timber framework at construction of E.Z. Co. Zinc Works at Risdon
Building foundations for Derwent Prime furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows workmen building foundations of Derwent Prime furnace at E.Z. Co Zinc Works at Risdon 1930
Bricks stacked inside corrugated iron shed at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows construction and extension of factory building at E.Z. Co. Zinc Works at Risdon, with bricks stacked inside building partially clad in corrugated iron 1921
Bricks and timber stacked near corrugated iron building at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows stacks of bricks and sawn timber near corrugated iron-clad building with solid stone foundation, situated above the railway line at E.Z. Co. Zinc Works at Risdon
Bricks and timber stacked at E.Z. Co. Zinc Works at Risdon 1924
Black-and-white photograph shows piles of bricks and sawn timber amid excavation work and construction of new buildings at E.Z. Co. Zinc Works at Risdon
Bricklayers building furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows bricklayers and men working on Derwent Prime furnace at E.Z. Co. Zinc Works at Risdon
Boxing for foundations of Derwent Prime furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows workmen building box work for foundations of Derwent Prime furnace at E.Z. Co Zinc Works at Risdon 1930
Assembling crane on wharf at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows two workers atop a partially assembled crane on riverside wharf at E.Z. Co. Zinc Works at Risdon, with words “Babcock and Wilcox”, “London and Renfrew” on the nameplate.